| MLP |
A Department-defined benchmark which establishes the minimum level of production that must be met for an oil sands lease to be classified as producing. The required minimum level of production per term year is 2,400 m3 of bitumen per section, on average, over the lease term.
Ãâó: www.energy.gov.ab.ca/1919.asp
|
|---|---|
| MLP |
A lossless compression algorithm that can be optionally employed on DVD-Audio discs to reduce bit rate, providing longer playing time.
Ãâó: www.extremetech.com/print_article/0,3428,a%253D160...
|